Operating Instructions

Complete quick commissioning:
Switchover the display using an arrow key: nO → YES
Press the OK key.
You have entered all of the data that is necessary for the quick commissioning of the inverter.
),1,6+
Commissioning
5.4 Quick commissioning using the BOP-2 operator panel
Converter with the CU230P-2 Control Units
Operating Instructions, 04/2018, FW V4.7 SP10, A5E34257946B AF 177