Installation Instructions
Table Of Contents
- PM230 Power Module, IP55
- Legal information - Warning notice system
- Table of contents
- 1 Changes in this manual
- 2 Fundamental safety instructions
- 3 Launch
- 4 Installing/mounting
- 5 Connecting
- 6 Service and maintenance
- 7 Technical data
- 7.1 Overload capability of the inverter
- 7.2 Cable cross-sections and tightening torques
- 7.3 Electromagnetic compatibility - Overview
- 7.4 Ambient conditions
- 7.5 General technical data
- 7.6 Specific technical data
- 7.7 Restrictions for special ambient conditions
- 7.8 Current reduction depending on pulse frequency
- 7.9 Electromagnetic compatibility of variable-speed drives
- 8 Spare parts and accessories
- A Appendix
- Index

Installing/mounting
4.4 Installing the Control Unit and Operator Panel
PM230 Power Module, IP55
28 Hardware Installation Manual, 12/2016, A5E35319202B AB
4.4.2
Installing the operator panel or dummy cover
Mounting the operator panel or dummy cover on the IP55 Power Module
Either an operator panel or the dummy cover must be plugged on for the inverter to achieve
degree of protection IP55.
①
Attaching the operator panel or dummy cover:
Press the operator panel or dummy cover onto the
inverter as shown until you hear it click into place.
②
Removing the operator panel or dummy cover:
Use a suitable screwdriver to press the interlock
downward
s.