Operating Instructions

Commissioning
Preparing for commissioning
6
55 |
118
Siemens
A5E36496664A_f
Smart Infrastructure 2021-10-11
6.3 Preparing for commissioning
Before starting commissioning, you must know the answer to the following
questions:
What data does my variable speed drive have?
Which interfaces of the variable speed drive are active?
How is the variable speed drive integrated in the higher-level control system?
How is my variable speed drive set?
What technological requirements must the drive fulfill?
Which motor is connected to the variable speed drive?
In which region of the world is the motor used?
How is the motor connected?
What is the operating temperature of the motor?
For further information about the individual questions above, please refer to
Chapter 5.2 in the Operating Instructions for the Control Unit (A5E34257946B).
6.4 Carrying out basic commissioning
Basic commissioning is the first step of the commissioning procedure. The BOP-2
and IOP-2-BT operator panels guide you through the basic commissioning process
and prompt you to enter the most important data of your variable speed drive.
Basic commissioning is also possible with the SAM (Smart Access Module), see
A5E43332549, SIOS Entry-ID: 109792113).
NOTICE
If you are using the variable speed drive without operator panel, you can perform
basic commissioning with an external computer and the STARTER software.
Please refer to the Operating Instructions for the Control Unit (A5E34257946B),
Chapter 5.4.2.
Variable speed drive
Motor