Operating Instructions

Commissioning
Carrying out basic commissioning
6
59 |
118
Siemens
A5E36496664A_f
Smart Infrastructure 2021-10-11
Commissioning with IOP-2-BT
For further information on technical data, commissioning and operation of the
G120P with IOP-2-BT, see A5E39549448B, SIOS Entry-ID: 109781592.
To enter the data for the Quick Setup with the IOP-2-BT, proceed as follows:
Quick Setup
CAUTION
Requirements prior to using the Quick Setup
The user must be fully conversant with all safety instructions as detailed in the
"Fundamental Safety Instructions" section of the Operating Instructions for
your converter.
The converter must be installed and checked as per the relevant instructions in
the "Installation" sections of the converter Operating Instructions.
Macro source selection: During the Quick Setup process, the user will be
presented with a list of preset macros that determine the configuration of
converter. Every Control Unit Operating Instructions contain a list of the
macros that are specific for that particular Control Unit and show the wiring
configurations for each macro. For further information, see the relevant
Operating Instructions.
The information required to be input into the Quick Setup process can be
found on the motor rating label, an example of which is included in the
Operating Instructions for your converter.
If the motor is to operate with the "87 Hz characteristic"; You need to use the
"Advanced Setup" process and you need to connect the motor in Delta (Δ),
this is shown in the "Installation" section of the Operating Instructions for your
converter.
Select Setup Select Quick Setup Select Factory Reset (yes or
no)