Operating Instructions
Commissioning
Carrying out basic commissioning
6
56 | 118
Siemens A5E36496664A_f
Smart Infrastructure 2021-10-11
Commissioning with BOP-2
For further information on technical data, commissioning and operation of the
G120P with BOP-2, see A5E37143404B, SIOS Entry-ID: 109483379.
To enter the data for basic commissioning with the BOP-2, proceed as follows:
1. Press the keys ESC, and to navigate to the SETUP menu.
2. To start the basic commissioning process, press .
1. Use key and then keys and to choose between "YES" (restore
factory settings) or "NO" (do not restore factory settings.
2. Press to confirm your selection.
⇨
The next step in the commissioning process is then displayed automatically.
Set the regional settings for the motor, e.g. kW and Hz. Press and then
and in order to change the parameter value.
Specify the overload capability of the drive.
LOW OVL (duty cycle with "Low Overload") is normally used. Alternatively: HIGH
OVL (duty cycle with "High Overload").
Enter the supply voltage of the variable speed drive.
Select the relevant motor type:
● 1: INDUCT: Induction motor
● 2: SYNC: Synchronous motor
● 10: 1LE1 induction motor
● 13: 1LG6 induction motor
● 17: 1LA7 induction motor
● 19: 1LA9 induction motor
● 100: 1LE1 IND 100, 1LE1☐9 motors with motor code on the rating plate
Select the 50 Hz characteristic. If you wish to use the 87 Hz characteristic, refer
to the detailed technical documentation and the application example "Fans in 87
Hz operation" [➙ 93].