User Manual

Application Sheet FPB051
Fan powered box with series fan on analog output and staged
electric reheater on analog output
DXR2..18-
102A
6 / 6
Technical information in this document are subject to change. Drawings serve illustration purposes only.
Siemens is not responsible for content and any manual modifications.
2019-02-21
A6V10662238_en--_f_--_03
Engineering ABT Site engineering tool is required to configure the DXR2 automation stations.
See the Siemens Download Center at www.siemens.com/bt/download for the latest application configuration and
workflow tutorials.
Option combination according to available on-board I/Os on controller.
B1 (optional extract air temperature sensor) must be configured under ,Room temperature’ in order to serve for
room temperature control.
D2
a
(on-board presence detector) to be configured in ABT Site under ‚Presence detector 2‘ for maximum
combination of optional devices.
Type of operation (NO or NC). Multiple devices of the same type can be connected.
Management
station
Sample presentation of a Fan powered box application on the Desigo CC management station.
WARNING
Electric heat coils require safety limit thermostat
Improper installation of electric heating coils can result in fire and cause
destruction of life and property.
1. Install a high temperature cut-out switch on all electric heating elements.
2. Ensure that all wiring and installation conform to applicable safety codes and
regulations.
Siemens Switzerland Ltd
Building Technologies Division
International Headquarters
Gubelstrasse 22
CH-6301 Zug
Tel. +41 41-724 24 24
Fax +41 41-724 35 22
www.siemens.com/buildingtechnologies
© 2015 Siemens Switzerland Ltd
Subject to change