Commissioning Instructions

Configuration & Setup
Function
0
A6V12012974
Restricted
7 | 10
Configuration & Setup
Step 1 - In ABT Site, select Pressure monitor from Types in library.
Step 2 - Select room pressure monitor(s) (CET room pressurization for room).
Step 3 - For each room, make choice selections for:
On-board input
KNX PL-Link device
HVAC
the display will show "Close the sash, Failed, Do not use" until all ODPs have
been configured. This is expected.
Step 4 - For each Room ODP, go to Default values in ABT Site.
Step 5 - Set parameters to desired specification, see table.
Basic steps:
1. Determine the pressure level(s) for the alarm.
2. Set pressure level(s) for the alarm, and set the desired delay time.
3. Set the desired delay time for the audible alarm.