Commissioning Instructions

Restricted
A6V12093876
Central Operating Mode
Overview
The Central Operating Mode Determination passes central commands from PXC con-
troller or Desigo CC Scheduler and distributes them to DXRs located in the building
zones.
The application receives operating mode commands (inputs) either
From Desigo CC via BACnet command (normally priority 8 or 13). It overwrites
the other input sources.
From a clock timer with switching output, switch or relay contact (Prio 16). The
function is only active if no scheduler and no manual operation is active.
From a scheduler on PXC Controller (Prio 15)
As an option, the Application Function receives a request for night cooling, free
cooling, and a switching signal from the AHU.