ABT Site project data
Project data must be completed using ABT Site.
ABT Site library with standard or custom templates/types must be installed to
allow for backup of changes during commissioning following start-up.
1.4 Job site
Prerequisites at the job site
Automation stations installed and passed basic sanity test.
All mechanical documentation (diagrams and specifications) available.
1.5 Equipment
Equipment required depends on connection method and automation station type.
Connection method
Automation station (DXR1..)
USB
USB cable (micro USB)
Ethernet IP connection (DXR1.E
only)
- LAN cable
- If necessary: USB to Ethernet adaptor
Ethernet MS/TP connection
(DXR1.M only)
MS/TP port