Compact actuating room automation stations DXR1..
Table of contents Security best practices ..........................................................................................3 Cyber security disclaimer ..........................................................................................3 2 | 16 1 Before you begin .........................................................................................4 1.1 User knowledge...............................................................................................4 1.2 Design engineer .
Security best practices Cyber security disclaimer Security best practices Network setup must avoid direct connection from Internet to the end device. - Implement Port security to disallow connection and network participation of unauthorized laptops/devices to a switch. - Unauthorized access must be prevented by physical security measures. Thus, access to devices (controllers) must be limited to only those person who require it. Equipment can further be monitored via CCTV.
1 Before you begin User knowledge 1 Before you begin NOTICE ABT Site V3.3.2 or later must be used to configure Siemens Smart Infrastructure DXR1.. BACnet MS/TP and IP equipment controllers. 1.1 User knowledge ABT Site has two online help systems: - ABT Site online help - Application online help ABT Site online help is the “tool” help - how to create projects, load templates etc. To access, click the Help button.
Before you begin 1 Job site ABT Site project data Project data must be completed using ABT Site. ABT Site library with standard or custom templates/types must be installed to allow for backup of changes during commissioning following start-up. 1.4 Job site Prerequisites at the job site ● ● Automation stations installed and passed basic sanity test. All mechanical documentation (diagrams and specifications) available. 1.
2 Adding a project 2 Adding a project w Make sure that in ABT Site > Settings > Project and paths, you have specified a valid local project folder in the Local project folder. 1. Click Add project. 2. Enter a Name. 3. Enter an Administrator password and confirm the password. 4. (Optional) Enter a Description. 5. (Optional) Select Root project to add a new ABT Site project on the top level even if a lower level folder is selected a A project is added to the project table. The default name is New project.
Project settings 3 3 Project settings Use Settings to define the default settings applicable to the entire project and its objects. Refer to ABT Site online help for detailed information. Note: If you have not yet set a password for your user, ABT Site opens your project in Settings > User profiles. Set the password for your user type and delete the remaining user types.
4 Defining a building structure Adding buildings and building elements 4 Defining a building structure The building structure organizes individual rooms in a logical manner or by location according to the building project. The building structure is used to create a unique designation of all elements (object names). The building structure is created using the following structure elements: building and building element. 4.1 Adding buildings and building elements Add a building w Enter the Building page. 1.
Defining a building structure Deleting buildings and building elements 4 4.3 Deleting buildings and building elements l Right-click the building or building element to be deleted and select Delete. a If the building or building element is empty, the elements are deleted. a If the building or building element contains automation stations or rooms, a message is displayed.
5 Configuring application templates Application configuration 5 Configuring application templates 1. Select Building > Building structure > Add devices > Add application template. 2. Click Import application type, and select an *.s1ca file in your computer. a The selected application type is added to the library. 3. Select an application template from your project or an application type from your library. Click Add template to project. 4. The template opens in Configuration > Application configuration.
Configuring application templates 5 Default values 5.1.3 Configure disciplines and coordination functions 1. Check the activated features against your plans and configure as needed. 2. Select additional features in the corresponding discipline. 3. Continue until all disciplines are configured. a The features for this template are configured. Note ● Selecting an I/O or network peripheral device automatically activates the corresponding discipline feature.
6 Setting project address 6 Setting project address Open Settings > Address defaults. ● IP: Define IP naming and address defaults in the network. ● MSTP: Define MS/TP naming and address defaults in the network. ● BACnet: Define BACnet naming. NOTICE Avoid setting the IP or MS/TP network number to 3. It is used for the USB network port.
Connecting DXR1 to ABT Site 7 7 Connecting DXR1 to ABT Site 1. Go to Start up > Configure and download, and click the arrow beside the symbol (connection settings), and select the corresponding device type and network. – USB: select the device type PTP for both IP and MS/TP devices. – Ethernet: Select the device type: IP devices or MS/TP devices. 2. Click Connect and the device is connected successfully to ABT Site. Note: ● Once you have specified the connection settings, you can click the directly.
7 Connecting DXR1 to ABT Site Command Description Set Max Master for all devices on network (MS/TP only) Allows the selected device to set the Max Master Address value to all devices that support this command. A configured device must be selected so that the set Max Master operation can be issued to other devices on the network. The value can be set to a specific value (1 through 127) or to Auto.
Downloading device configurations 8 8 Downloading device configurations You can configure and download devices by mapping engineered devices with discovered devices. Note: When multiple devices are selected for download and/or upload, one or more devices may fail to load due to network conditions, such as excessive network traffic. In these cases, select the devices that failed to load and repeat the download/upload command. A USB or Ethernet connection is established. 1.
Issued by Siemens Switzerland Ltd Smart Infrastructure Global Headquarters Theilerstrasse 1a CH-6300 Zug +41 58 724 2424 www.siemens.com/buildingtechnologies A6V11526405_en--_b © Siemens Switzerland Ltd, 2019 Technical specifications and availability subject to change without notice.