Commissioning Instructions
ABT-SSA (Setup & Service Assistant)
User interface overview: Installation
2
29 | 76
Siemens
A6V10429119_en--_a_07
Building Technologies
2018-12-19
– If the result is Failed, select a reason from the Comment drop-down list and complete the Tested by and
Assigned to fields.
Note: The comment is transferred to the ABT project following read back of data.
– If the result is Passed, complete the Tested by field.
4. Click Save to save your changes and collapse the row.
Note: The result is stored as a new entry in the commissioning history event log.
2.4.1.4 KNX PL-Link bus
KNX PL-Link bus state and device configuration
The KNX PL-Link bus > Identification view summarizes the status of the KNX PL-Link bus and allows you to
start/stop the bus, disable the internal power supply and configure KNX PL-Link automation stations.
To perform the procedures in this section, select KNX PL-Link bus in the command bar and Identification in the
left navigation pane.
Reset the KNX PL-Link bus
⚫ Click Reset.
All devices with KNX PL-Link are reinitialized (runtime configuration, bus configuration).
The KNX PL-Link bus is restarted, and the status is displayed as Operational.
The number of configured devices with KNX PL-Link is displayed.
Start/stop the KNX PL-Link bus
⚫ Click the Stop/Run toggle button.
The KNX PL-Link bus is started or stopped and the status is displayed (operational/stopped).
Disable internal power supply
If an external power supply is used, make sure the internal KNX power supply is turned off.