User Guide

Schedules
Working with Schedules
6
153 | 393
Siemens
User Guide Version 3.0
A6V10415471
Building Technologies
2017-11-30
6 Schedules
This section provides background information and instructions for using BACnet
schedules, management station schedules and the Timeline Viewer in Desigo CC.
6.1 Working with Schedules
This section provides step-by-step instructions for using BACnet schedules,
management station schedules and the Timeline Viewer. For background
information, see Schedules Reference [➙ 165].
Perform the workflows in this section as needed.
6.1.1 Working with BACnet Schedules
This section provides step-by-step instructions for using BACnet Schedules. For
background information, see BACnet Schedules Reference [➙ 165].
Perform the procedures in this section as needed.
6.1.1.1 Adding a BACnet Calendar
System Manager is in Operating mode.
1. In System Browser, select Application View.
2. Select Schedules > BACnetCalendars.
3. Select the Scheduler tab.
4. Click Save .
5. Complete the Name field.
6. From the Field Device drop-down list, select the panel you want this calendar
associated with.
7. Click OK.
6.1.1.2 Adding a BACnet Schedule
System Manager is in Operating mode.
1. In System Browser, select Application View.
2. Select Schedules > BACnetSchedules.
3. Select the Setup tab.
4. Select the Default value and the Data type and complete the remaining fields.
5. From System Browser, d rag objects that you want associated with the
schedule into the Outputs tab.
6. Complete the resulting display of fields as needed.
7. Click Save .
8. In the Create New Object dialog box, do the following:
a. From the Field Device drop-down list, select the panel you want this
schedule associated with.
b. Enter a name and description.
c. Click OK.