Operating Instructions
Table Of Contents
Scheduler
Scheduler user interface
35 | 80
Siemens
A6V11211557_enUS_b
Building Technologies
2019-01-15
5 Scheduler
The Scheduler core function allows you to:
● View the Scheduler and Calendar objects in the database.
Scheduler user interface [➙ 35]
Managing exception schedules [➙ 44]
● View and modify the Exceptions, which are used to override the weekly schedule.
Exception schedules [➙ 41]
● Modify the schedule
– Add a new switching point (change of value or setting).
– Modify the time, value or setting for a switching point.
– Delete a switching point, which indicates the time for a change of value or
setting.
– Return an object to the Schedule default.
Modifying a schedule [➙ 38]
● Modify the Schedule default value.
Modifying the Schedule default [➙ 40]
● Copy the activities from one day to other days in the weekly schedule.
Copying one day’s activities [➙ 41]
5.1 Scheduler user interface
This section outlines the Scheduler controls and the value or setting indicators
displayed in the work area.
Viewing Scheduler objects in the database
Scheduler objects are saved in the Schedulers/Calendars list of the currently-selected
location in the building structure.
Scheduler is selected in the core function pane.
1. Navigate through the building structure to locate the desired object.
2. Select to display the schedule in the work area.