User`s manual
DataNET Copper Connections, Continued
Down Link Wiring with
DataNET Hub Signal
Equalizer Board
Step Action
1. Plug the DataNET Hub Signal Equalizer Board into the
selected Port interface connector.
2. Connect the board’s pig tail leads to the corresponding hub
downlink port channel; red lead to (+) terminal, black lead to
(-) terminal and white lead to Gnd terminal. See Figure 2-1.
Master Port
Connectors
TB15 – TB18
3. Connect the downlink signal wires to the removable port
connector (TB1) on top of the equalizer board. Positive to
(+) terminal; and Negative to (-) terminal. See Figure 2-1.
.
SW2
SW1
SW3
TB1Port
Connector
Board
Connector
GND
-
+
4. If conduit is used the cable shield is only terminated at one
end of the cable. If shield is terminated at this end connect it
to terminal 3 (GND) on board. If using cable gland
connectors, cable gland will always connect the shield to
the chassis.
5. Set the switches on the board to the correct settings; see
DataNET Hub Signal Equalizer Board Settings page
34.
32 • Installation 2000585-001