User`s manual
Unpacking and Inspection
Description
This section provides the steps to follow when receiving and unpacking
the Advance DataNET Hub (DNH).
Receipt of DNH
When DNH is received, examine the shipping container for evidence of
external damage. Outside damage may be an indicator of damage to the
DNH. Record any external damage.
Unpacking
Open the carton containing the DNH and remove all packing material.
Carefully remove the unit from the carton and inspect it for damage that
may have occurred during transportation. Carefully examine shipped
contents with those listed on the Bill of Lading. All items should match
those on the Bill of Lading.
Perform the following inspections:
• Inspect DNH exterior for dents, chipped paint, scratches etc.
• Open DNH hinged top cover and visually inspect interior mounted
assemblies, and connectors.
• If DNH is to be rack or wall mounted, be certain the proper mounting
hardware is provided.
• Inspect all field wiring connectors and switches. There must not be
any damage to these connectors or switches.
• Check internal power supply(s) for damage.
Reporting Damage
If there is any evidence of damage to the shipping carton or the DNH,
notify the carrier and your local Siemens Energy & Automation, Inc.
representative. Keep all shipping materials as evidence of damage for
carrier’s inspection. Immediately contact your Siemens representative
who will arrange for immediate repair or replacement. The Customer
Service department can be contacted as follows:
In the United States: (800) 448-8224
Internationally: 001-918-662-7030
16 • Installation 2000585-001