Advance DataNET Hub User's Manual

2000585-001 Installation
15
Chapter 2
Installation
Overview
This chapter is intended for installation personnel. After completing the
procedures in this chapter the Advance DataNET Hub (DNH) will be
ready for operation. To ensure a safe and trouble free installation, follow
all procedures and associated advisory information.
Ensure that all AC Power (Mains) Specification requirements and adviso-
ries are met. Failure to do so, and operating the equipment in a manner
not specified, may impair the safety protection provided by the equip-
ment.
Before beginning the installation process read through this Chapter to
familiarize yourself with the installations requirements. This will aid you to
ensure a safe and trouble free installation.
Topic See Page
Unpacking and Inspection 16
Wall or Rack Mounting Installation 17
Site Wiring Requirements 19
CE Installations 23
Wiring Connections 25
AC Power (Mains) Connections 26
DataNET Copper Connections 29
DataNET Hub Signal Equalizer Board 34
Hub Signal Equalizer Board with Generic Cable 37
DataNET Fiber Optic Connections 42
Ethernet Connections 45
Introduction
WARNING
Installation Overview