Operating instructions
Commissioning (software)
2.7 Commissioning modes
Control Units CU240S
Operating Instructions (Compact), 04/2006, A5E00766042B AA
2-49
Prerequisites
• Supply voltage is active for the download inverter
• The download inverter is in "Ready State".
Parameter Action/Description (Factory setting: bold) Setting
Insert the MMC to the download inverter and perform the manual download according the flow
chart.
P0010 = 30 Commissioning parameter*
0: Ready
1: Quick commissioning
2: Inverter
30: Factory setting
95: Commissioning the fail-safe functions (CUs with Safety-Integrated functions only)
P0804 = ? Select Clone file (for download)
0: clone00.bin
…
99: clone99.bin
P0803 = 2 Transfer data to EEPROM
0: Disabled
1: Start OP Transfer
2: Start MMC Transfer
If the download has been completed successfully, P0010 and P0803 will be set to 0 and the
"RDY" LED is on.
If the upload has failed, F0061 (MMC-PS not fitted) or F0062 (MMC-PS contents invalid) resp.
F0063 (MMC-PS contents incompatible) will be displayed, LED "SF" (red) is on.
In this case insert a proper MMC and attempt another download or perform a factory reset.
After a successful manually download remove the MMC from inverter and insert it to the next
download inverter. Then perform the download steps again until the series commissioning has
been completed for all inverters.
Automatic Download
The automatic download at start-up is controlled via P8458. With the automatic download all
necessary parameters including the parameters regarding fail-safe functions are downloaded
into the inverter.
Note
MMC for "automatic download"
For an automatic download always the file clone00.bin will be used.
The user has to take care, that clone00.bin (saved as "clone00.bin" with STARTER on PC or
via setting P0804 = 00 with the OP) is available on the MMC, used for an automatic
parameter download at start-up. Otherwise automatic download will not be porocessed.










