Operating instructions

Commissioning
4.5 Commissioning with STARTER
CU240S and CU240E Control Units, FW 3.2
70 Operating Instructions, 03/2009, A5E02440075B AA
4.5.4 Commissioning the application
Description
You can now commission your application using the "Drive Navigator" screens or by
using the functions available in the project tree.
Save your settings so that they are protected against power failure (see below).
Once you have commissioned your application, disconnect the online connection
between the PC and inverter by clicking on
.
Figure 4-16 Application communication
Storing data in a power-independent manner
In the project tree, select your SINAMICS project
Double-click on "Drive Navigator".
Select "Commissioning" in the working area
In the dialog box, select "Save data in the drive (RAM to ROM)".
You can now disconnect the online connection with
"Disconnect from target system"