Operating instructions
Commissioning
4.3 Preparing commissioning
CU240S and CU240E Control Units, FW 3.2
48 Operating Instructions, 03/2009, A5E02440075B AA
4.3 Preparing commissioning
Prerequisites: before you start
Before you start parameterization, you should clarify the following issues about
commissioning your application.
Are the factory settings sufficient for your application?
To start, check which factory settings you can use and which settings you wish to change
(see Section 'Commissioning with factory settings' (Page 51)). When doing so, you may find
that you only need to change just a few parameters.
Which motor are you using? [P0300]
● A synchronous or induction motor?
The SINAMICS inverters are preset in the factory for applications using 4-pole three-phase
induction motors that correspond to the performance data of the inverter.
Motor data / data on the motor rating plate
If you use the STARTER commissioning tool and a SIEMENS motor, you only have to
specify the motor Order No. In all other cases, you must read-off the data from the motor
rating plate and enter into the appropriate parameters.
P0307
3~Mot
1LA7130-4AA10
EN 60034
Cos ϕ 0.81
50 Hz
1455/min
5.5kW 19.7/11.A
230/400 V ∆/Υ
Cos ϕ 0.82
60 Hz
6.5kW
460 V
10.9 A
1755/min
No UD 0013509-0090-0031 TICI F 1325 IP 55 IM B3
Υ 440-480
11.1-11.3 A 45kg
∆/Υ 220-240/380-420 V
19.7-20.6/11.4-11.9 A
P0311
P0308
P0304P0305
P0310
95.75%
P0309










