Technical data

CU230P-2 Control Units, Getting Started
18 A5E02484096, 05/2009
If the data that are saved in
STARTER for the inverter involved
(offline data) are different from those
of the inverter (online data), then the
adjacent screen is displayed.
First, press the "Load HW
configuration to PG" button to
overwrite the offline data with the
data of the inverter and then the
"Close" button and proceed with the
commissioning.
Note
If you first press the "Close" button, then the online connection is terminated before any data has been changed.
4.1.5 Start commissioning
Description
After you have gone online, open the commissioning dialog box with the following steps: