User Manual
4.3.3 Dimension drawings, drilling dimensions for the PM230 Power Module, IP20......................70
4.3.4 Dimension drawings, drilling dimensions for PM240P-2 Power Modules, IP20.....................73
4.3.5 Dimension drawings, drilling dimensions for the Power Module PM330, IP20......................75
4.3.6 Dimensioned drawings, drilling dimensions for the PM240-2 Power Module, IP20...............76
4.3.7 Dimensioned drawings, drilling dimensions for the PM250 Power Module............................79
4.3.8 Dimension drawings, drilling dimensions for PM230 and PM240-2 Power Modules
utilizing push-through technology...........................................................................................82
4.4 Connecting the line supply and motor....................................................................................86
4.4.1 Permissible line supplies........................................................................................................86
4.4.1.1 TN line system.......................................................................................................................87
4.4.1.2 TT line system........................................................................................................................89
4.4.1.3 IT system................................................................................................................................90
4.4.2 Protective conductor..............................................................................................................91
4.4.3 Connecting the inverter with the PM230 Power Module IP55................................................93
4.4.4 Connecting the inverter with the PM230 Power Module........................................................98
4.4.5 Connecting the inverter with the PM330 Power Module......................................................100
4.4.6 Connecting the inverter with the PM240P-2 Power Module.................................................101
4.4.7 Connecting an inverter with the PM240-2 Power Module....................................................103
4.4.8 Connecting the inverter with the PM250 Power Module......................................................108
4.4.9 Connecting the motor to the inverter in a star or delta connection.......................................110
4.5 Connecting the interfaces for the inverter control................................................................111
4.5.1 Plugging the Control Unit onto the Power Module...............................................................111
4.5.2 Overview of the interfaces....................................................................................................114
4.5.3 Fieldbus interface allocation.................................................................................................115
4.5.4 Terminal strips......................................................................................................................116
4.5.5 Factory interface settings.....................................................................................................118
4.5.6 Default setting of the interfaces............................................................................................120
4.5.7 Digital inputs and outputs on the PM330 Power Module.....................................................138
4.5.8 Wiring terminal strips............................................................................................................139
4.5.9 Connecting the temperature contact of the braking resistor................................................142
4.5.10 Connecting the inverter to PROFINET.................................................................................143
4.5.10.1 Communication via PROFINET IO and Ethernet.................................................................143
4.5.10.2 Connecting the PROFINET cable to the inverter.................................................................144
4.5.10.3 What do you have to set for communication via PROFINET?.............................................145
4.5.10.4 Installing GSDML.................................................................................................................146
4.5.11 Connecting the inverter to PROFIBUS.................................................................................146
4.5.11.1 Connecting the PROFIBUS cable to the inverter.................................................................147
4.5.11.2 What do you have to set for communication via PROFIBUS?.............................................147
4.5.11.3 Installing the GSD................................................................................................................148
4.5.11.4 Setting the address..............................................................................................................148
5 Commissioning.........................................................................................................................................151
5.1 Commissioning guidelines...................................................................................................151
5.2 Tools to commission the inverter.........................................................................................152
5.3 Preparing for commissioning................................................................................................153
5.3.1 Collecting motor data...........................................................................................................153
5.3.2 Forming DC link capacitors..................................................................................................155
5.3.3 Inverter factory setting..........................................................................................................157
5.4 Quick commissioning using the BOP-2 operator panel........................................................159
5.4.1 Inserting the BOP-2..............................................................................................................159
Table of contents
Converter with the CU230P-2 Control Units
6 Operating Instructions, 04/2018, FW V4.7 SP10, A5E34257946B AF