User Manual

5.5.3 Go online and start the commissioning Wizard
Procedure
1. Select your project and go online:
2. In the following screen form, select the inverter with which you wish to go online.
3. Once you are online, select "Commissioning" → "Commissioning Wizard":
You have started the commissioning Wizard of the inverter.
5.5.4 Commissioning wizard
Select the application class
Procedure
When selecting an application class, the inverter assigns the motor control with the appropriate
default settings:
[1]
Standard Drive Control (Page 184)
[2] Dynamic Drive Control (Page 186)
[0] Expert - or if no application class is listed:
Expert (Page 188)
Commissioning
5.5 Quick commissioning with a PC
Converter with the CU230P-2 Control Units
182 Operating Instructions, 04/2018, FW V4.7 SP10, A5E34257946B AF