User Manual

5.4 Quick commissioning using the BOP-2 operator panel
5.4.1 Inserting the BOP-2
Plugging on an operator panel
Procedure
1. Locate the lower edge of the Operator Panel into the matching recess of the Control Unit.
2. Plug the Operator Panel onto the inverter until the latch audibly engages.
The operator panel is plugged onto the Control Unit.
The operator panel is ready for operation when you connect the inverter to the power supply.
Commissioning
5.4 Quick commissioning using the BOP-2 operator panel
Converter with the CU230P-2 Control Units
Operating Instructions, 04/2018, FW V4.7 SP10, A5E34257946B AF 159