User Manual

Default setting 15: "Process industry"
$FNQRZOHGJHIDXOW
212))
([WHUQDOIDXOW
6ZLWFKRYHUVSHHGVHWSRLQW
1RIXQFWLRQ
0RWRUL]HGSRWHQWLRPHWHUORZHU
1RIXQFWLRQ
0RWRUL]HGSRWHQWLRPHWHU023KLJKHU
6SHHGVHWSRLQW
6SHHGDFWXDOYDOXH
$FWXDOFXUUHQWYDOXH
$ODUP
)DXOW
0
',
',
',
',
',
',
$,

$2
$2
'2

'2

',
',
',
',
',
',
DO 0: p0730, DO 1:
p0731
AO 0: p0771[0],
AO 1: p0771[1]
DI 0: r0722.0, …, DI 5: r0722.5 AI 0: r0755[0]
Motorized potentiometer setpoint after ramp-function generator: r1050
Speed setpoint (main setpoint): p1070[0] = 755[0], p1070[1] = 1050
Designation in the BOP-2: Proc
Default setting 17: "2-wire (forw/backw1)"
6SHHGVHWSRLQW
$FNQRZOHGJHIDXOW
212))FORFNZLVH
212))FRXQWHUFORFNZLVH
6SHHGDFWXDOYDOXH
&XUUHQWDFWXDOYDOXH
$ODUP
)DXOW
$,
',
',
',

$2
$2
'2

'2

DO 0: p0730, DO 1:
p0731
AO 0: p0771[0],
AO 1: p0771[1]
DI 0: r0722.0, …, DI 2: r0722.2 AI 0: r0755[0]
Speed setpoint (main setpoint): p1070[0] = 755[0]
Designation in the BOP-2: 2-wIrE 1
Installing
4.5 Connecting the interfaces for the inverter control
Converter with the CU230P-2 Control Units
Operating Instructions, 04/2018, FW V4.7 SP10, A5E34257946B AF 123