Home Theater Server User Manual
Chapter 10 - Create/Edit
Schedule/Command/Calendar
81
Siemens Industry, Inc.
125-3584T
2. Click the value under the Priority column to change the exception priority. The
Exception priority is the priority in which exception schedules are executed. If there
are more than one exception schedules for the same time, the exception schedule
with the higher priority will be executed.
3. Click the – sign at the bottom left of the window to delete an Exception Schedule.
Command Point ObjectsNotReleased
1. From within the Object Editor window, click the Command Point Objects button to
open the Edit Command Objects window.
2. Click the + sign at the bottom left of the window to add a Command Object to the
Schedule Object.
- Click the Object drop down to choose a reference objects or a Command
Object.
- Enter a property identifier in the Property ID field.