Basic Documentation

Information in this publication is based on current specifications. The company reserves the right to make changes in specifications and models as design
improvements are introduced. Product or company names mentioned herein may be the trademarks of their respective owners. © 2014 Siemens Industry,
Inc.
Siemens Industry, Inc. Printed in the USA
Building Technologies Division Document No. A6V10431169
1000 Deerfield Parkway Page 9 of 9
Buffalo Grove, IL 60089-4513
USA
Tel. +1 847-215-1000
Part 3 – Execution
3.01 Installation
Installation shall be the responsibility of the mechanical contractor. The contractor shall install the drive in accordance with
the recommendations of the VFD manufacturer as outlined in the installation manual.
The electrical contractor shall complete power wiring. The contractor shall complete all wiring in accordance with the
recommendations of the VFD manufacturer as outlined in the installation manual.
3.02 Start Up
Certified factory start-up shall be provided for each drive by a factory authorized service center. A certified start-up form
shall be filled out for each drive with a copy provided to the owner, and a copy kept on file at the manufacturer.
3.03 Product Support
Factory trained application engineering and service personnel that are thoroughly familiar with the BT300drive products
offered will be locally available at both the specifying and installation locations.
3.04 Warranty
Warranty shall be 18 months from date of manufacture or 30 months with certified start-up.