Installation guide
Mobility and Logistics, Traffic Solutions
Sopers Lane, Poole, Dorset, BH17 7ER
Security classification Unrestricted Page 64 of 84
Version 1 Status Issued
Last Editor Carl Rabe Date 11-Dec-2014
Document Name Stratos Outstation General and ICM Handbook Document No. 667/HB/52250/000
Copyright © Siemens plc 2014. All Rights Reserved. Mobility and Logistics is a division of Siemens Plc
LED Description Expected
result during
normal
installation
Lamp Supply
Voltage Test (LV)
Check the Lamp Supply Voltage is within
tolerance (LV)
Only pass if
connected lamp
supply is ~230V
AC
Mains Clock Test Check the Mains Clock count rate Pass
Support Battery
Test
Check the Support Battery is connected and
available
Pass
GSPI IO Reads and logs the GSPI IO card Inventory
Only pass if
PSU and one IO
Card connected
Table 29 – System Self Test Scenario










