Operating instructions
e1955
11.1999
32
Siemens Building Technologies
Cerberus Division
Lamp test
What is the «Lamp test» used for?
For testing the correct functioning of all indicators (LEDs), the display, and the alarm buzzer.
All visual and audible devices of the control console are activated for a few seconds.
Initiate lamp test
1. Press
F2
Ü The MAIN MENU is displayed
With
choose the function «DEVICE level»
2. Press
ok
Ü The STATIONS overview is displayed
Press
to select the desired station (terminal)
3. Press
F1
Ü The FUNCTION LIST ’terminal’ is displayed
Press
to select «initiate LAMP TEST» and press
ok
Ü The lamp test is initiated
ok:execute F1:stations C:end
MAIN MENU
FIRE detection
EXTINGUISHING sections
CONTROL in- /outputs
GEOGRAPHICAL location
DEVICE level
logical address (CSX no.)
STATIONS
01 control unit CC1140 ground floor
FUNCTION LIST ’terminal’:
poll INFORMATION ’terminal’
02 terminal CT11 corridor 1st floor
set contrast of DISPLAY
initiate LAMP TEST
set sound level of BUZZER
poll EVENT MEMORY (terminal)
ISOLATE PRINTER (terminal)
ok:select F1:function C:end
ok:funct.unit F2:menu F1:function