User Guide

Chapter 10 - Create/Edit
Point Editor Application
94
BACnet Field Panel Web Server User Guide
125-3584
2017-07-31
Configuring a Point for Totalization
The totalization function accumulates the runtime value of a point. It can be used to:
Accumulate run time for fans and pumps.
Accumulate volume total from a flow rate sensor.
Calculate degree days (used in PPCL).
To configure a point for totalization:
1. Select the Point icon from the Create/Edit bar.
The
Point Editor window opens.
2. If no panels/devices display, click Select a Device at the top of the left pane of the
Point Editor window to display available panels/devices.
3. Select the desired panel/device and the desired point device by clicking the arrow
next to the panel name to display devices, and then clicking the device name in the
left pane of the Point Editor window.
The point information window opens, displaying point details.
4. Select the Totalization Rate. Options include Seconds, Minutes, or Hours.
For binary and multistate point types, a totalized value is calculated for each
state and represents an accumulation of time spent in that state.
For analog point types, the totalized value is calculated using the following
equation:
Where:
V = value; T = time at that value. All times are in seconds.
The Totalized Value can be viewed in Point Commander.
5. Click Save.
The Save button is unavailable once the modifications are complete.
Deleting a Point
1. Click the Point icon from the Create/Edit bar.
The Point Editor window opens.
2. If available panels/devices do not display, click Select a Device at the top of the left
pane of the Point Editor window to display available panels/devices.
3. Select the desired panel, the desired FLN, and the desired device by clicking the
arrow next to the panel name to display FLNs, and then clicking the arrow next to
the FLN name to display devices, and then clicking the device name in the left
pane of the Point Editor window.
The available points display in the lower half of the left pane.
4. Select the points to be deleted by checking the check box(es) to the left of the point
names.