User Guide

Chapter 10 - Create/Edit
Schedule/Command/Calendar Object Editors
104
BACnet Field Panel Web Server User Guide
125-3584
2017-07-31
Creating a Schedule Exception
1. From within the Object Editor window, click the Exception Schedule button to open
the Edit Exception Calendar window.
2. Click the + sign at the bottom left of the window to add an Exception Schedule.
Choose Date, Date Range, Week’N’Day, or Reference (to reference an existing
Calendar Object)
Enter schedule details.
3. Click the Edit Time Values button to add time values to the Exception Schedule.
Click the plus sign at the bottom of the Edit Time Values window to add
rows to the Time/Values table.