User Guide
Chapter 10 - Create/Edit
Schedule/Command/Calendar Object Editors
103
Siemens Industry, Inc.
BACnet Field Panel Web Server User Guide
125-3584
2017-07-31
The Save button is not available once the modifications are complete.
Creating a Weekly Schedule
1. From within the Object Editor window, click the Weekly Schedule button to open
the Edit Weekly Schedule window.
2. Choose the day of the week by clicking the tabs at the top of the window.
3. Click the + sign at the bottom left of the window to add rows to the Time/Values
table.
4. Click the – sign at the bottom left of the window to delete rows from the
Time/Values table.
5. Double-click the entry in the Time column to change the start and stop times.
6. Double-click the entries in the Value column to change the desired values.
NOTE:
To add a schedule to multiple days of the week, click the
Add Multiple button.