Engineering Documentation

Table Of Contents
Chapter 2 Network Electrical Systems
Power Trunk Guidelines
68
| 231
125-3002
Step 1 - Determine the VA Rating for Each Controller
VA ratings can be found under the heading Power Source Requirements in the
chapter that covers each type of controller.
If future options are to be installed, the VA rating of the affected controllers can be
increased. Therefore, if future upgrades will be implemented, include their power
consumption in your calculations.
Example
Controller Type VA Required
C1 DXR2.M18-101B (Fan Coil Application with Actuator GMA151.1P – 1 DO, 1 Y, 1U) 15 VA
C2, C3, C4 TEC (Dual Duct Controller—1 AVS, Application 35 with Hot Water Heat) 13.6 VA
C5 Standard UC
4 UI @ 1.25 each
3 UO @ 1.25 each
2nd I/0 card
Keypad display
Total
15.0 VA
5.0 VA
3.75 VA
4.0 VA
5.0 VA
32.75 VA
32.75 VA
C6, C7 TEC (Dual Duct Controller—1 AVS, Application 35 with
2-stage Electric Heat)
27.9 VA
C8 Standard UC
3 UI @ 1.25 each
1 UO @ 1.25 each
Total
15.0 VA
3.75 VA
1.25 VA
20.0 VA
20.0 VA
C9, C10 TEC (Dual Duct Controller—1 AVS, Application 35, with Electric Heat) 19.4 VA
C11 M12P-102B-GDE (Variable Air Volume with Actuator, Room Automation QMX3.P37) 19.4 VA
C12 TEC (Constant Volume Controller—Electronic Output, Application 30) 5.7 VA
Fig. 40: Example Layout.