Engineering Documentation

Table Of Contents
Chapter 2 Network Electrical Systems
RS-485 ALN and FLN (P1) Communications Wiring on Structured Cabling
58
| 231
125-3002
Fig. 34: Multiplexed FLN 1, 2, 3 to RJ-45 Terminated Patch Cable, 538-911(S).
Converting Chain Segments to SCS Star Segments
CAUTION
All field panels should be taken offline and controlled devices placed under
manual control prior to changing field panels and network from RS-485 to
Ethernet ALN.
1. Remove chained patch cables from the field panel ALN port and RJ-45 jack box.
2. Install Ethernet controller and RJ-45 patch cable in the field panel.
3. Remove all UTP cross-connect wires from punchdown connecting blocks.
See Figure 12.
4. Install RJ-45 patch panel to the punch-down connecting blocks per TIA 568A or
TIA 568B, as required, and install RJ-45 patch cable between the patch panel and
the network device.