Engineering Documentation

Table Of Contents
Appendix A Discontinued Products
Modular Building Controller/Remote Building Controller (MBC/RBC)
174
| 231
125-3002
PTM Wiring Diagram Reference.
Point Type Specifics PTM Qty PTM Type Diagram
Logical ON/OFF/AUTO Pulsed
Control
1 – DO (ON)
1 – DO (OFF)
1 – DO (AUTO)
1 – DI (Proof)
LOOAP (no proof) 1-1/2 2Q250 Connecting
an LOOAP
(No Proof)
LOOAP (proof of contact) 1-1/2
1/2, or
1/4
2Q250
2D20, or
4D20
Connecting
an LOOAP
(Proof of
Contact)
LOOAP (proof of voltage) 1-1/2
1/2
2Q250
2D250
Connecting
an LOOAP
(Proof of
Voltage)
Logical Two-State Latched
1 – DO (ON/OFF)
1 – DI (Proof)
L2SL (no proof) 1/2, or
1/2
2Q250, or
2Q250-M
Connecting
an L2SL (No
Proof)
L2SL (proof of contact)
1/2, or
1/2
1/2, or
1/4
2Q250, or
2Q250-M
2D20, or
4D20
Connecting
an L2SL
(Proof of
Contact)
L2SL (proof of voltage)
1/2, or
1/2
1/2
2Q250, or
2Q250-M
2D250
Connecting
an L2SL
(Proof of
Voltage)
WARNING:
High and low voltage cannot be combined on the same PTM.
A 2Q250-M PTM must have 24 Vac voltage fed into the M-Bus.
CAUTION:
Circuits powering PTM6.2Q50-M point modules must be limited by a 15-amp (max.) circuit breaker.
Logical Two-State Pulsed
1 – DO (ON)
1 – DO (OFF)
1 – DI (Proof)
L2SP (no proof) 1 2Q250
Connecting
an L2SP (No
Proof)
L2SP (proof of contact) 1
1/2, or
1/4
2Q250
2D20, or
4D20
Connecting
an L2SP
(Proof of
Contact)
L2SP (proof of voltage) 1
1/2
2Q250
2D250
Connecting
an L2SP
(Proof of
Voltage)
Point Termination Module Wiring Diagrams
WARNING
All transformer or isolated power supply secondary neutrals requiring connection to
earth ground must be directly connected to an approved building earth ground
terminal located at the point termination module where the signal is terminated.
This is represented in the following diagrams by “E” at the earth ground symbol.