Engineering Documentation

Table Of Contents
How to Use This Manual
125
-3002
11 | 231
How to Use This Manual
This wiring guidelines manual was developed to reduce the installed cost of Siemens
Industry energy management systems through consistent estimating, installation, and
operation. It provides information that can be shared with electrical contractors for
proposals and training purposes. This manual does not provide wiring guidelines for
specific field devices.
This section covers manual organization, manual conventions and symbols used in
the manual, how to access help, related publications, and any other information that
will help you use this manual.
Manual Organization
This manual contains the following chapters:
Chapter 1, Wiring Regulations and Specifications, contains Regulatory and
general wiring requirements for installing APOGEE products.
Chapter 2, Network Electrical Systems, contains communications wiring guidelines
for various network systems and the power trunk.
Chapter 3, Field Panels, describes the wiring guidelines for Automation Level
Network (ALN) devices that are currently available for purchase.
Chapter 4, Equipment Controllers, describes the wiring guidelines for Field Level
Network (FLN) controllers that are currently available for purchase.
Appendix A, Discontinued Products, describes the wiring guidelines for
discontinued ALN and FLN devices.
The Glossary describes the terms and acronyms used in this manual.
An Index helps you locate information presented in this manual.
Manual Conventions
The following table lists conventions to help you use this manual in a quick and
efficient manner.
Convention Examples
Numbered Lists (1, 2, 3…) indicate a
procedure with sequential steps.
1. Turn OFF power to the field panel.
2. Turn ON power to the field panel.
3. Contact the local Siemens Industry representative.
Conditions that must be completed or met
before beginning a task are designated with a
.
Intermediate results (what will happen
following the execution of a step), are
designated with a
.
Results, which inform the user that a task was
completed successfully, are designated with a
.
Composer software is properly installed.
A Valid license is available.
1. Select Start > Programs > Siemens > GMS >
Composer.
The Project Management window displays.
2. Open an existing project or create a new one.
The project window displays.
Actions that should be performed are specified
in boldface font.
Type F for Field panels.
Click OK to save changes and close the dialog box.
Error and system messages are displayed in
Courier New font.
The message Report Definition successfully renamed
displays in the status bar.