Brochure

Zone Control Unit (ZCU) Solutio
n
Product Information
Document No. 153-567
August 1, 2015
Information in this publication is based on current specifications. The company reserves the right to make changes in specifications and
models as design improvements are introduced. LONMARK is a registered trademark of Echelon Corporation. BACnet is a registered
trademark of the American Society of Heating, Refrigeration and Air-Conditioning Engineers, Inc. Other product or company names
mentioned herein may be the trademarks of their respective owners. © 2015 Siemens Industry, Inc.
Siemens Industry, Inc.
1000 Deerfield Parkway
Buffalo Grove, IL 60089-4513
USA
847-215-1000
Your feedback is important to us. If you have
comments about this document, please send them to
SBT_technical.editor.us.sbt@siemens.com
Document No. 153-567
Printed in the USA
Page 5
Table 3. Standard Part Number Offering, Availability and Ordering.
1 2 3 4 5 6 7 8 9 1 2 3 4 5 6 7
Prefix
Manufacturer
Type
Inlet Size
Liner
Case
Rows/Elec Heat
Fan/Volts
Attenuator/Access
Left/Right
Prefix
Controls
Power
Options
Air Actuator
Water Actuator
Specials
Spare
Z H 10650 0 00 L/R ZB1 0 0 0 0 0 0
3 08 1 R/L 2131 1
10 2 328 3
12 5 A
14 8 T
16 B
20
24
Quick
Ship
In Stock
Base
Offering Part
Numbers
VAV Box and Hydronics
ZCU P/N 1 (VAV Box)
Control Packages
ZCU P/N 2 (Controls)
Availability
NOTES:
1. Left/Right refers to which side of the ZCU assembly the controls and hydronics are on when looking into the inlet of the VAV box.
R/R and L/L are only viable options on the longer attenuator-equipped VAV boxes.
2.
All other part number variants not reflected in Table 3 require a seven-week lead time for shipment
.
Typical Assembly Order
ZCU units are ordered in one lump sum total instead of individually identified box part numbers and room tags.
Siemens provides a detailed quote for each job, since job box schedules tend to be building-specific with unique
engineering parameters and box tags. Order details remain in the engineering submittal, which serves as a
contract between the customer and the manufacturer.
Three-Step Sales Process
1. Send box schedule and Div 15 specs to Siemens. Siemens returns a bid price.
2. Upon bid acceptance, Siemens creates a job-specific submittal. The key deliverable in the submittal
package is the room schedule, which describes individual box engineering parameters and features.
3. When the job representative accepts the submittal, a lump sum PO is submitted, and shipments begin.