User`s manual
Chapter 2
Installation
Introduction
Overview
This chapter is intended for installation personnel. After completing the
procedures, within this Chapter, the Advance Network Gateway will be ready
for operation.
Ensure that all AC Power (Mains) Specification requirements and advisories
are met. Failure to do so, and operating the equipment in a manner not
specified, may impair the safety protection provided by the equipment.
WARNING
Installation Overview
Before beginning the installation process read through this Chapter to
familiarize yourself with the installation requirements.
The following table provides a recommended sequence of events you should
follow to ensure a safe and trouble free installation.
Topic See Page
Unpacking and Inspection 10
Pre Installation Planning 11
Wall or Rack Mounting 14
CE Installations 15
Wiring Connections 17
AC Power (Mains) Connections 18
Data Hiway Connections 20
Ethernet Connections 23
2000590-001 Installation • 9