User`s manual
36 •• Installation 2000591-001
DataNET Fiber Optic Connections, Continued
Since there is a Fiber Optic Coupler for each channel the following
procedure should be repeated for each channel.
Step Action
1. Turn off AC Power (Mains) to the ANG.
WARNING
Placing the Power Supply Assembly toggle ON/OFF switch
to OFF does not remove the main voltage to the unit. To
remove all input power to the unit, the external AC Power
(Mains) to the unit needs to be shut off.
2. Connect the Fiber Optic cable, 10-pin connector to J12 on
the ANCB.
J12
3. Since the DataNET is connected to Port 2 on each ANCB
only the Channel B pair of fiber optic cable is connected to
the Fiber Optic Coupler. Tieback to the cable the 6-pin
connector labeled Channel A. Connect the Channel B ca-
ble to the Fiber Optic Coupler.
Instructions