User`s manual
2000591-001 Installation •• 33
DataNET Copper Connections, Continued
To make the connections easier we have made the port connector a re-
movable connector. Simply grasp the top portion of the connector and
pull it straight out from the base connector.
Step Action
3. Designate which ANCB module will be Channel A and
which will be Channel B. We suggest the right module be
channel A.
4. Locate the Port 2 connector. To make the connections
easier the connector comes apart. Simply loosen the two
recessed captive screws, grasp the top portion of the con-
nector and pull it straight out from the base connector
DataNET
Port 2 Connections
Pin 4 = +
Pin 5 = -
Pin 6 = Ground
Port 2 Pin 1 (+)
Important
All DataNET copper connections are made to Port 2. Do
Not make any DataNET copper connections to Port 1.
5. Loosen the top wire retaining screws from the removed
connector. Strip the insulation ¼ -inch back from each of
the connector leads.
6. Connect the Channel A, DataNET wires to port 2 terminals.
Repeat for Channel B, DataNET connections. Tighten
down the retaining screws
7. Plug DataNET cable connectors into their base connectors.
Installation Note
Instructions,
continued