User`s manual
30 •• Installation 2000591-001
Data Hiway Connections, Continued
Step Action
6. Connect the ADH Channel cable to channel A port 1, ADH
+ and - terminals. Connect the ADH Channel B to Port 1 on
the Channel B designated board. Tighten down all the re-
taining screws.
Data Hiway Port 1
Connections
Pin 1-ADH-A+
Pin 2-ADH-A-
Pin 3- Ground
Pin 1
ADH cable shields are grounded at one end only. If ground
is at ANG end, use GND terminal.
7. Repeat steps 6 and 7 for Channel B, Port 1 connector.
8. Perform Data Hiway Post Installation Test; refer to Appen-
dix A. How to Test the Data Hiway.
9. Remove the ADH plug connector from each ANCB. Do Not
make final connections until you have set the loop and unit
number; see page 47 Setting Network Address & Loop and
Unit Numbers.
10. You are now ready to make the DataNET connections; go
to page 31.
Instructions,
continued