User`s manual

14 Installation 2000591-001
Unpacking and Inspection
This section provides the steps to follow when receiving and unpacking
the Advance Network Gateway (ANG).
When the unit is received, examine the shipping container for evidence
of external damage. Record any external damage.
Open the carton containing the ANG and remove all packing material.
Carefully remove the unit from the carton and inspect it for damage that
may have occurred during transportation. Carefully examine shipped
contents with those listed on the packing slip. All items should match
those on packing slip.
Perform the following inspections:
Inspect ANG exterior for dents, chipped paint, scratches etc.
Open ANG hinged top cover and visually inspect interior mounted
assemblies, and connectors.
If ANG is to be rack or wall mounted, be certain the proper mounting
hardware is provided.
Inspect all field wiring connectors and switches. There must not be
any damage to these connectors or switches.
Check internal power supply(s) for damage.
If there is any evidence of damage to the shipping carton or the ANG
notify the carrier and your local Siemens Applied Automation representa-
tive. Keep all shipping materials as evidence of damage for carriers in-
spection. Immediately contact your Siemens Applied Automation repre-
sentative who will arrange for immediate repair or replacement. The
Siemens Applied Automation Customer Service department can be
contacted as follows:
Inside Oklahoma: 918-662-7430
Outside Oklahoma: 800-448-8224 (toll free)
Internationally: 001-918-662-7430
Description
Shipping Damage
Unpacking
Reporting Damage