User`s manual
2000591-001 Installation •• 13
Chapter 2
Installation
Overview
This chapter is intended for installation personnel. After completing the
procedures in this chapter the Advance Network Gateway (ANG) will be
ready for operation. To ensure a safe and trouble free installation, follow
all procedures and associated advisory information.
Ensure that all AC Power (Mains) Specification requirements and adviso-
ries are met. Failure to do so, and operating the equipment in a manner
not specified, may impair the safety protection provided by the equip-
ment.
Before beginning the installation process read through this Chapter to
familiarize yourself with the installations requirements. This will aid you to
ensure a safe and trouble free installation.
Topic See Page
Unpacking and Inspection 14
Pre Installation Planning 15
Wall or Rack Mounting Installation 16
Site Wiring Requirements 18
CE Installations 22
Wiring Connections 24
AC Power (Mains) Connections 25
Data Hiway Connections 28
DataNET Connections 31
DataNET Copper Connections 32
DataNET Fiber Optic Connections 34
Introduction
WARNING
Installation Overview