User manual
Engineering
3.4 STEP 7 V5
SITOP UPS1600 / UPS1100
58 Operating Instructions, 05.2014, C98130-A7628-A1-4-7629
3.4.2
Using UPS1600 in a project
To be able to use UPS1600, it must be assigned to an IO controller as an IO device.
Preconditions
● The GSD file of the UPS1600 has been correctly installed.
● STEP 7 V5 has been opened, and a project with an IO controller has been created.
Creating a subnet
1. Open the Hardware view "HW Config".
2. Call the Shortcut menu of line "PN-IO", and select "Add PROFINET IO system".