User manual

Engineering
3.3 STEP 7 in the TIA-Portal
SITOP UPS1600 / UPS1100
52 Operating Instructions, 05.2014, C98130-A7628-A1-4-7629
Procedure
1. Right-click the UPS1600 controller in the project tree.
The context menu opens.
2. In the shortcut menu, in submenu "Download to device", select option "Hardware
configuration".
The project data are compiled. The "Load" button is activated as soon as loading is
possible.
3. Click on the "Load" button.
The project data are loaded. The "Load results" dialog is then opened. In this dialog, you
can check whether the load task was successful and select any further actions.
4. Click on the "Finish" button.
Result
The selected project data are loaded to the UPS1600 via the controller.