User manual
Safety, approvals, EMC
8.2 Test voltage
SITOP UPS1600 / UPS1100
120 Operating Instructions, 05.2014, C98130-A7628-A1-4-7629
8.2
Test voltage
Figure 8-1 Test voltage diagram
Only the manufacturer can perform the type test and production test; users can also perform
the field test.
Preconditions for performing the field test:
Test (A)
● Connect the input, output, BAT and signaling contact with one another and measure with
respect to PE
Test (B)
● Connect all PROFINET cables and measure with respect to PE (input, output, BAT signal
connector and PE can be connected with each other)
Table 8- 1 Test voltage
Test time
Input, output, BAT ↔ PE (A)
PROFINET ↔ PE (B)
Type test
60 s
700 VDC
2200 VDC
60 s
500 VAC
1500 VAC
Production test
1 s
200 VDC
2200 VDC
1 s
140 VAC
1500 VAC
Field test
1 s
200 VDC
2200 VDC
1 s 140 VAC 1500 VAC
Remark:
Tripping current for DC measurement: 0
mA
Tripping current for AC measurement: <100 mA