Specifications
Feeder Protection SIPROTEC 7SC80
9/13SIPROTEC Compact · SIEMENS SIP 3.01 · Edition 3
Commissioning
Commissioning could not be easier and is supported by
DIGSI 4. The status of the binary inputs can be read individu-
ally and the state of the binary outputs can be set individu-
ally. The operation of switching elements (circuit-breakers,
disconnect devices) can be checked using the switching
functions of the relay. The analog measured values are
represented as wide-ranging operational measured values.
To prevent transmission of information to the control center
during maintenance, the communications can be disabled
to prevent unnecessary data from being transmitted.
During commissioning, all indications with test tag for test
purposes can be connected to a control and protection
system.
Test operation
During commissioning, all indications can be passed to a
control system for test purposes.
1
2
3
4
5
6
7
8
9
10
Function description










