User Manual
6 / 14
Siemens RXM39.1 - PL-Link I/O Block CM2N3836en_06
Building Technologies 2016-05-19
Mounting notes
The PL-Link I/O Block can be mounted in any position using the following
attachment methods:
80060
80061
Mounting on tophat rail
The housing base contains a snap-on
option to mount on tophat DIN rails, type
EN50022-35x7,5 (snap off using
screwdriver)
Direct mounting
Four predrilled holes to mount using
screws
(drilling diagram, see "Dimensions").
The housing base has higher support
surfaces.
Screws: Max. dia. 3.5 mm
Observe the following for mounting:
• Heat generated during operation must be removed; make sure the air circulates
sufficiently around the device.
• Easy access for service.
• Comply with local installation regulations!
The mounting instructions including drilling template is printed on the device
packing.
Commissioning notes
Outputs are inactive (relay off, analog outputs 0 V, when an application does not
use an output.
The outputs can be controlled and the inputs queried as part of a special test mode
(SSA).
STOP
Caution!
• The thermal fuse in the transformer may be triggered in case of extended
overload (ca. 4 minutes) or short circuits.
The device must then be replaced.
• The AC 24 V side does not have protection against faulty wiring on
AC 230 V.
• AC 230 V mains power for supply and relay must be switched off prior to
plugging in and removing plug-in terminals (risk of electric shock!)
• Supply circuits are interrupted as soon as plug 19/21 is removed from the
device. (Bridges 19-19 and 21-21 are located on the print, not the plug; see
terminal diagram page 11).
Secure state
Functional test