User Manual

6 / 14
Siemens RXM39.1 - PL-Link I/O Block CM2N3836en_06
Building Technologies 2016-05-19
Mounting notes
The PL-Link I/O Block can be mounted in any position using the following
attachment methods:
80060
80061
Mounting on tophat rail
The housing base contains a snap-on
option to mount on tophat DIN rails, type
EN50022-35x7,5 (snap off using
screwdriver)
Direct mounting
Four predrilled holes to mount using
screws
(drilling diagram, see "Dimensions").
The housing base has higher support
surfaces.
Screws: Max. dia. 3.5 mm
Observe the following for mounting:
Heat generated during operation must be removed; make sure the air circulates
sufficiently around the device.
Easy access for service.
Comply with local installation regulations!
The mounting instructions including drilling template is printed on the device
packing.
Commissioning notes
Outputs are inactive (relay off, analog outputs 0 V, when an application does not
use an output.
The outputs can be controlled and the inputs queried as part of a special test mode
(SSA).
STOP
Caution!
The thermal fuse in the transformer may be triggered in case of extended
overload (ca. 4 minutes) or short circuits.
The device must then be replaced.
The AC 24 V side does not have protection against faulty wiring on
AC 230 V.
AC 230 V mains power for supply and relay must be switched off prior to
plugging in and removing plug-in terminals (risk of electric shock!)
Supply circuits are interrupted as soon as plug 19/21 is removed from the
device. (Bridges 19-19 and 21-21 are located on the print, not the plug; see
terminal diagram page 11).
Secure state
Functional test