User Manual

Siemens A6V10733768_en--_b
2020-04-29
CAUTION
The devices are not protected against accidental connection to AC 230 V.
Use the correct cables for the KNX PL-Link bus.
Do not interchange the wires of the KNX PL-Link cable.
Observe all local installation regulations.
Commissioning
Prerequisites
Before commissioning the device, make sure an application is downloaded into the
connected controller, from where the functions are downloaded in the device.
Download the application using SSA-DNT (Pack & Go) or ABT.
For this purpose (or for service), connect ABT to the controller via USB or Ethernet.
Automatic commissioning
When connected to the KNX PL-Link bus, the device automatically communicates with the
connected controller. The following routine is executed.
Step With display Description
1 Build number and version of the device are displayed.
2 The individual address (IA) is downloaded into the
device via KNX PL-Link.
This step is skipped if the device is already configured.
Note: The configuration file can be downloaded any
time; as a result, these characters are displayed every
time the controller initializes download.
3 After startup, the device displays a normal operation
page.
(The operation page displayed on the left side is a
sample view; the view depends on the application
selected on the controller.)
3b When the configuration is faulty, "Unconfigured" is
displayed along with the temperature measured by the
local temperature sensor.
In this case, manual commissioning must be performed
(see below).