User Manual
Table Of Contents
- 1 Cyber security disclaimer
- 2 Preconditions of this document
- 3 System overview
- 4 Desigo workflow, tools and programming
- 4.1 Coverage of the technical process
- 4.2 Coverage of the system
- 4.3 Main tasks
- 4.4 Tools for different roles
- 4.5 Working with libraries
- 4.6 Working in parallel and subcontracting
- 4.7 Workflow for primary systems
- 4.8 Workflow for room automation classic
- 4.9 Workflow for Desigo room automation
- 4.10 Desigo Configuration Module (DCM)
- 4.11 Desigo Xworks Plus (XWP)
- 4.12 Desigo Automation Building Tool (ABT)
- 4.13 Programming in D-MAP
- 5 Control concept
- 6 Technical view
- 7 Global objects and functions
- 8 Events and COV reporting
- 9 Alarm management
- 9.1 Alarm sources
- 9.2 Alarm example
- 9.3 Effects of BACnet properties on alarm response
- 9.4 Alarm response of the function blocks
- 9.5 Alarm functions
- 9.6 Alarm management by notification class
- 9.7 Alarm routing over the network
- 9.8 Alarm queuing
- 9.9 Common alarms
- 9.10 Alarm suppression
- 9.11 Alarm message texts
- 10 Calendars and schedulers
- 11 Trending
- 12 Reports
- 13 Data storage
- 14 Network architecture
- 15 Remote access
- 16 Management platform
- 17 Desigo Control Point
- 18 Automation stations
- 19 Logical I/O blocks
- 20 Room automation
- 21 Desigo Open
- 22 System configuration
- 22.1 Technical limits and limit values
- 22.2 Maximum number of elements in a network area
- 22.3 Desigo room automation system function group limits
- 22.4 Devices
- 22.4.1 PXC..D automation stations / system controllers
- 22.4.2 LonWorks system controllers
- 22.4.3 Automation stations with LonWorks integration
- 22.4.4 PX Open integration (PXC001.D/-E.D)
- 22.4.5 PX Open integration (PXC001.D/-E.D + PXA40-RS1)
- 22.4.6 PX Open integration (PXC001.D/-E.D + PXA40-RS2)
- 22.4.7 PX KNX integration (PXC001.D/-E.D)
- 22.4.8 TX Open integration (TXI1/2/2-S.OPEN)
- 22.4.9 Number of data points on Desigo room automation stations
- 22.4.10 Number of data points for PXC3
- 22.4.11 Number of data points for DXR1
- 22.4.12 Number of data points for DXR2
- 22.4.13 PXM20 operator unit
- 22.4.14 PXM10 operator unit
- 22.4.15 Desigo Control Point
- 22.4.16 PXG3.L and PXG3.M BACnet routers
- 22.4.17 SX OPC
- 22.4.18 Desigo CC
- 22.4.19 Desigo Insight
- 22.4.20 Desigo Xworks Plus (XWP)
- 22.4.21 Desigo Automation Building Tool (ABT)
- 22.5 Applications
- 23 Compatibility
- 23.1 Desigo version compatibility definition
- 23.2 Desigo system compatibility basics
- 23.2.1 Compatibility with BACnet standard
- 23.2.2 Compatibility with operating systems
- 23.2.3 Compatibility with SQL servers
- 23.2.4 Compatibility with Microsoft Office
- 23.2.5 Compatibility with web browsers
- 23.2.6 Compatibility with ABT Go
- 23.2.7 Compatibility with VMware (virtual infrastructure)
- 23.2.8 Compatibility of software/libraries on the same PC
- 23.2.9 Hardware and firmware compatibility
- 23.2.10 Backward compatibility
- 23.2.11 Engineering compatibility
- 23.2.12 Compatibility with Desigo Configuration Module (DCM)
- 23.2.13 Compatibility with Desigo PX / Desigo room automation
- 23.2.14 Compatibility with Desigo RX tool
- 23.2.15 Compatibility with TX-I/O
- 23.2.16 Compatibility with TX Open
- 23.3 Desigo Control Point
- 23.4 Upgrading from Desigo V6.2 Update (or Update 2) to V6.2 Update 3
- 23.5 Siemens WEoF clients
- 23.6 Migration compatibility
- 23.7 Hardware requirements of Desigo software products
- 24 Desigo PXC4 and PXC5
- 25 Compatibility of Desigo V6.2 Update 3 with PXC4 and PXC5
Control concept
Superposed plant controls
5
CM110664en_07 87 | 351
● When the step-up demand signal [StepUp] persists for longer than the monitoring time deviation
[TiMonDev], and there are no further sequence steps to increase the power.
● When the step-up demand signal [StepUp] persists for longer than the monitoring time deviation
[TiMonDev] plus the step-up delay time of the next sequence step, AND a step-up would cause the
maximum power limit [MaxPwr] to be exceeded.
The process alarm is reset to normal:
● When a sequence step with an increase in power becomes possible again. Another sequence step with
an increase in power becomes possible when the [MaxPwr] limit will no longer be exceeded, or when a
further sequence step with a power increase is present.
● When there is no further [StepUp] demand signal
The text of process alarms can be defined to suit customer requirements.
Switching alternatives
Various switching alternatives can be defined by entries in the profile table. Note that where one or more
step-up sequence steps (intended to increase the power) would, in practice, result in a drop in the power
output, all steps in the step-up sequence are enabled automatically until a sequence entry is reached, at
which the power output actually does increase as required. See also the following example.
The power data in the object table and the sequence entries in the profile table in Figure
Example of
aggregate table
together give the power profile illustrated in Figure
Example of profile entries with a drop in
power (Profile 2)
.
Profile 1
In the main application of the PWR_CTL function, a new energy producer is added for each sequence entry
in the profile table. For this purpose, an aggregate only needs to be entered in the sequence table once.
In the event of a power demand, which the boiler transmits to the PWR_CTL function in the form of the
[StepUp] demand signal, a further boiler stage / sequence step is enabled when the step-up delay has
expired. When a boiler reaches the stage limit, the function switches to the next boiler or boiler stage after
expiry of the switch-on delay. The last-enabled boiler stage is released to local power control, while all
other boilers are fixed at their current power output.
If the power needs to be reduced, this is transmitted to the PWR_CTL function via the [StepDn] demand
signal. The sequence steps are then executed in reverse order, with the defined switch-off and step-down
delay times.