User Manual
Table Of Contents
- 1 Cyber security disclaimer
- 2 Preconditions of this document
- 3 System overview
- 4 Desigo workflow, tools and programming
- 4.1 Coverage of the technical process
- 4.2 Coverage of the system
- 4.3 Main tasks
- 4.4 Tools for different roles
- 4.5 Working with libraries
- 4.6 Working in parallel and subcontracting
- 4.7 Workflow for primary systems
- 4.8 Workflow for room automation classic
- 4.9 Workflow for Desigo room automation
- 4.10 Desigo Configuration Module (DCM)
- 4.11 Desigo Xworks Plus (XWP)
- 4.12 Desigo Automation Building Tool (ABT)
- 4.13 Programming in D-MAP
- 5 Control concept
- 6 Technical view
- 7 Global objects and functions
- 8 Events and COV reporting
- 9 Alarm management
- 9.1 Alarm sources
- 9.2 Alarm example
- 9.3 Effects of BACnet properties on alarm response
- 9.4 Alarm response of the function blocks
- 9.5 Alarm functions
- 9.6 Alarm management by notification class
- 9.7 Alarm routing over the network
- 9.8 Alarm queuing
- 9.9 Common alarms
- 9.10 Alarm suppression
- 9.11 Alarm message texts
- 10 Calendars and schedulers
- 11 Trending
- 12 Reports
- 13 Data storage
- 14 Network architecture
- 15 Remote access
- 16 Management platform
- 17 Desigo Control Point
- 18 Automation stations
- 19 Logical I/O blocks
- 20 Room automation
- 21 Desigo Open
- 22 System configuration
- 22.1 Technical limits and limit values
- 22.2 Maximum number of elements in a network area
- 22.3 Desigo room automation system function group limits
- 22.4 Devices
- 22.4.1 PXC..D automation stations / system controllers
- 22.4.2 LonWorks system controllers
- 22.4.3 Automation stations with LonWorks integration
- 22.4.4 PX Open integration (PXC001.D/-E.D)
- 22.4.5 PX Open integration (PXC001.D/-E.D + PXA40-RS1)
- 22.4.6 PX Open integration (PXC001.D/-E.D + PXA40-RS2)
- 22.4.7 PX KNX integration (PXC001.D/-E.D)
- 22.4.8 TX Open integration (TXI1/2/2-S.OPEN)
- 22.4.9 Number of data points on Desigo room automation stations
- 22.4.10 Number of data points for PXC3
- 22.4.11 Number of data points for DXR1
- 22.4.12 Number of data points for DXR2
- 22.4.13 PXM20 operator unit
- 22.4.14 PXM10 operator unit
- 22.4.15 Desigo Control Point
- 22.4.16 PXG3.L and PXG3.M BACnet routers
- 22.4.17 SX OPC
- 22.4.18 Desigo CC
- 22.4.19 Desigo Insight
- 22.4.20 Desigo Xworks Plus (XWP)
- 22.4.21 Desigo Automation Building Tool (ABT)
- 22.5 Applications
- 23 Compatibility
- 23.1 Desigo version compatibility definition
- 23.2 Desigo system compatibility basics
- 23.2.1 Compatibility with BACnet standard
- 23.2.2 Compatibility with operating systems
- 23.2.3 Compatibility with SQL servers
- 23.2.4 Compatibility with Microsoft Office
- 23.2.5 Compatibility with web browsers
- 23.2.6 Compatibility with ABT Go
- 23.2.7 Compatibility with VMware (virtual infrastructure)
- 23.2.8 Compatibility of software/libraries on the same PC
- 23.2.9 Hardware and firmware compatibility
- 23.2.10 Backward compatibility
- 23.2.11 Engineering compatibility
- 23.2.12 Compatibility with Desigo Configuration Module (DCM)
- 23.2.13 Compatibility with Desigo PX / Desigo room automation
- 23.2.14 Compatibility with Desigo RX tool
- 23.2.15 Compatibility with TX-I/O
- 23.2.16 Compatibility with TX Open
- 23.3 Desigo Control Point
- 23.4 Upgrading from Desigo V6.2 Update (or Update 2) to V6.2 Update 3
- 23.5 Siemens WEoF clients
- 23.6 Migration compatibility
- 23.7 Hardware requirements of Desigo software products
- 24 Desigo PXC4 and PXC5
- 25 Compatibility of Desigo V6.2 Update 3 with PXC4 and PXC5
Desigo workflow, tools and programming
Main tasks
4
38 | 351 CM110664en_07
● Sales: Offer preparation and tracking
● Planning/Engineering: Network planning and design, floor plan, cabling, designing control cabinets,
designing electrical wiring diagrams, creating rating plates, validating pharma systems
● Project management: Ordering devices, project planning, claim management, project task planning
● Service management: Service database for devices, network planning, remote service platform
Sales support
Desigo Configuration Module (DCM) supports the calculation of the Desigo configuration for the sales
process.
You can verify if:
● The Desigo configuration is technically correct, that is, the solution that was sold can be implemented
with Desigo
● The system limits have been taken into account, that is, the number of possible devices and functions
in the network is verified
● The quantity is correct, that is, correct device types for the automation and room functions, field
devices, accessories and licenses
● Services are correctly calculated
● The design for the review with the customer is well documented
● Prices are correct (regional companies can add their prices to the DCM database)
Configuration and programming
The configuration and programming flexibility of system devices depends on the product or product family.
Some devices contain preloaded applications and connections only to specific periphery device types.
You can configure and parameterize the devices offline or partly online with a configuration tool. You can
replace the preloaded applications on some devices in the project.
You can freely program some devices. To create loadable applications, you can use libraries to assemble
project-specific solutions.
Degree of standardization and flexibility
The table below shows engineering methods by degree of standardization and flexibility:
● Level A: High degree of standardization with predetermined flexibility
● ...
● Level E: Low degree of standardization with very high flexibility
Solutions with a high degree of standardization
Solutions with a high degree of standardization are:
● More efficient to configure and commission than freely programmed solutions
● Easier to maintain, because the functions are verified and well documented
Solutions with a low degree of standardization
Solutions with a low degree of standardization, that is, freely programmed solutions, are:
● More laborious to create and document
● More error-prone than verified solutions
● Harder to maintain in the service phase, because they do not adhere to the standard and are often not
as well documented as verified solutions
The intermediate levels B, C and D allow you to choose a solution with the right balance of flexibility and
standardization.
Desigo PX: